亚洲制服丝袜中文字幕自拍_曰本a级毛片在线观看_国产 对白 普通话 视频_亚洲成在人线在线播放

CONTACT US

13770259688

Dongtai Fu De Machinery Co., Ltd.
Address:No. 16 Zhenxing Road, Dongtai Development Zone
Mobile:+86.013770259688
Website:eosub.com
Email:ldyc@sina.com
Industry information

Your current location:Home > Industry information

  • Application and maintenance of pile hammer(9)
  • 2018/3/19 Times of reading:[1328]
  • Large penetration of piles

    Pile penetration speed is too fast, will make the top and bottom piston collision quickly separation, combustion chamber compressed air temperature and pressure can not be maintained to make diesel ignition explosion.

    Methods of elimination:

    Put the fuel pump in zero gear, lift the upper piston, drill several times until the penetration of the pile is within the normal range, the pile hammer can start normally.

Copyright:Dongtai Fu De Machinery Co., Ltd. Telephone:+86.013770259688 Record number:Su ICP 18011909. Technical support:Sike Network
Telephone:+86.0515-88102095 Website:www.fdmachine.com Email:ldyc@sina.com Address:No. 16 Zhenxing Road, Dongtai Development Zone
Disclaimer: Part of the content of this website is from the Internet, if it unintentionally involves third-party intellectual property rights, please call or write to inform, this site will be timely response and improvement.